Fall 2025 Accessibility Improvements

Posted in News

New Accessible Path to Healy Ground Floo
New Accessible Path to Healy Ground Floor
Accessible Circulation Desk at E.B. Williams Library, Capitol Campus
Accessible Circulation Desk at E.B. Williams Library, Capitol Campus
  • As part of the Elevator Modernization project, the elevators at Building D and Dahlgren Memorial Library at GUMC, and the Healy Hall elevator have been upgraded.
  • A new ramp has been provided at the Philodemic Room stage in Healy Hall.
  • A new accessible circulation desk has been built at the E.B. Williams Library on the Capitol Campus.
  • An exterior accessible path has been provided to the Healy Hall ground floor entry (with interior access to the elevator). 
  • A new single-user accessible toilet room has been built on the Healy Hall ground floor as part of the newly renovated Healy G project.
  • Visual contrast has been provided at steps within the ICC auditorium and at the stairs leading from the ICC third-floor atrium to the second floor, to improve safety and access for people with low vision.

Additionally, multiple new projects have been completed with accessible features 

  • Newly built residence halls (Hayden and Byrnes) provide accessible apartment-style dorm rooms on each floor and accessible common areas throughout the facilities.
  • The renovated 111 Mass. Ave. building at the Capitol Campus has accessible spaces throughout, including but not limited to restrooms, sensory room, classrooms, office space and common areas.